Nepal-China transmission - News Online English

Breaking

News Online English

News Online

BANNER 728X90

Friday, 18 March 2022

Nepal-China transmission

The feasibility study for a 400KV transmission line from Gyirong (Kerung) in China to Rasuwagadi in Nepal has been completed. The 70km line will have 214 towers and is expected to be completed in six years. A ‘load flow test’ has already been carried out.  



from Nepali Times https://ift.tt/v4wIcT6
via IFTTT

No comments:

Post a Comment